Eminent Domain Laws by State (2026): Takings and Compensation
Independently fact-checked against primary sources (last audited October 21, 2026). · 17 primary sources cited on this page. How we verify our legal content

The Fifth Amendment lets government take private property only for a public use and only with payment: "nor shall private property be taken for public use, without just compensation" (U.S. Const. amend. V). That clause is the federal floor. Each state writes its own condemnation procedure, deadlines, fee rules and valuation rules, and most states now have their own limits on takings that benefit private developers, many adopted after Kelo v. City of New London (2005), where the U.S. Supreme Court said nothing in its opinion "precludes any State from placing further restrictions on its exercise of the takings power."
This guide covers the federal rules first and then compares all 50 states and the District of Columbia. For disputes between neighbors over rights of way and prescriptive easements, see our guide to easement laws by state.
Information last verified on 2026-10-21. This article has not been reviewed by a licensed lawyer.
Jurisdiction scope: This guide covers government condemnation of real property, and condemnation by private companies to which a legislature has delegated the power (utilities, pipelines, railroads and common carriers), under federal law and the law of all 50 states and the District of Columbia. Regulatory takings get one paragraph, and tax foreclosure is limited to the Tyler and Pung paragraph. Private easement disputes between neighbors, prescriptive easements and landlocked-property access are covered in our easement laws by state guide. Local ordinances are not covered.
Federal Eminent Domain Law
Federal law supplies the outer limits that every taking must meet, and it governs takings by the United States itself. State law fills in nearly everything else.
The Takings Clause
The Fifth Amendment's last clause reads: "nor shall private property be taken for public use, without just compensation." Two separate requirements sit in that sentence. The taking must be for a public use, and the owner must receive just compensation.
When the government formally condemns property, the Supreme Court treats it as a physical taking. In Cedar Point Nursery v. Hassid, 594 U.S. 139 (2021), the Court said: "The government commits a physical taking when it uses its power of eminent domain to formally condemn property."
Public use: Berman, Midkiff and Kelo
The Supreme Court has read "public use" broadly for decades.
- In Berman v. Parker, 348 U.S. 26 (1954), the Court said that "when the legislature has spoken, the public interest has been declared in terms well-nigh conclusive," subject to specific constitutional limitations, and that a legislature may decide "that the community should be beautiful as well as healthy."
- In Hawaii Housing Authority v. Midkiff, 467 U.S. 229 (1984), it held that "where the exercise of the eminent domain power is rationally related to a conceivable public purpose, the Court has never held a compensated taking to be proscribed by the Public Use Clause."
- In Kelo v. City of New London, 545 U.S. 469 (2005), the Court upheld takings for a city's economic development plan: "Because that plan unquestionably serves a public purpose, the takings challenged here satisfy the public use requirement of the Fifth Amendment."
Kelo also restated a limit. The Court said "the sovereign may not take the property of A for the sole purpose of transferring it to another private party B, even though A is paid just compensation," while a State may transfer property between private parties "if future 'use by the public' is the purpose of the taking."
The sentence that drove the state reforms came next: "We emphasize that nothing in our opinion precludes any State from placing further restrictions on its exercise of the takings power. Indeed, many States already impose 'public use' requirements that are stricter than the federal baseline." The state-by-state section below shows how states used that room.
At the federal level, Executive Order 13406 (71 Fed. Reg. 36973, June 28, 2006) stated a policy of limiting takings by the Federal Government to situations "for the purpose of benefiting the general public and not merely for the purpose of advancing the economic interest of private parties." It is a policy for federal agencies, not a limit on state or local condemnors.
How the federal government condemns land
A federal officer authorized to acquire real estate for a public building or other public use may acquire it by condemnation "under judicial process," and the Attorney General must begin the proceeding within 30 days after receiving the officer's application (40 U.S.C. 3113).
Under the declaration of taking statute, once the government files a declaration and deposits its estimated compensation in court, title vests in the government, the land is condemned, and "the right to just compensation for the land vests in the persons entitled to the compensation" (40 U.S.C. 3114(b)).
Federal Rule of Civil Procedure 71.1 governs the court case. The court tries all issues, including compensation, unless a federal statute creates a special tribunal, or, if none exists, a party demands a jury within the time to answer, "unless the court appoints a commission" (Fed. R. Civ. P. 71.1(h)(1)).
Suing the United States for a taking
The Tucker Act gives the U.S. Court of Federal Claims jurisdiction over "any claim against the United States founded either upon the Constitution" (28 U.S.C. 1491(a)(1)). The Supreme Court described the Tucker Act in Knick v. Township of Scott, 588 U.S. 180 (2019), as "the standard procedure for bringing such claims."
Knick also changed where claims against local governments can be brought. It overruled the rule that a takings plaintiff first had to litigate in state court, finding that "the state-litigation requirement imposes an unjustifiable burden on takings plaintiffs" and "must be overruled."
Inverse condemnation against a state
Inverse condemnation is a lawsuit by an owner whose property was taken or damaged without a formal condemnation case. In Devillier v. Texas (2024), owners sued the State of Texas, and the Court wrote that on remand, "DeVillier and the other property owners should be permitted to pursue their claims under the Takings Clause through the cause of action available under Texas law." Each state's deadline for these suits is different; examples appear in the inverse condemnation section below.
Pipelines and the Natural Gas Act
The Natural Gas Act lets a company holding a federal certificate that cannot acquire a needed right-of-way by contract, or cannot agree with the owner on compensation, acquire it "by the exercise of the right of eminent domain in the district court of the United States for the district in which such property may be located, or in the State courts." Federal district courts have jurisdiction only "when the amount claimed by the owner of the property to be condemned exceeds $3,000" (15 U.S.C. 717f(h)).
In PennEast Pipeline Co. v. New Jersey, 594 U.S. 482 (2021), the Court asked "whether the Federal Government can constitutionally confer on pipeline companies the authority to condemn necessary rights-of-way in which a State has an interest. We hold that it can."
How compensation is measured in those private pipeline condemnations is now before the Court. In Hoffmann v. WBI Energy Transmission, Inc., No. 25-159, certiorari was granted on June 29, 2026, and argument is set for November 9, 2026. The question presented is: "In private condemnations under the Natural Gas Act, should just compensation be determined by reference to state law?" The case is pending and has not been decided.
When an access right is itself a taking: Cedar Point
A regulation can take an easement without any condemnation case. In Cedar Point, a California rule gave union organizers access to farms "for three hours per day, 120 days per year," and the Court held that "The access regulation appropriates a right to invade the growers' property and therefore constitutes a per se physical taking." The Court added: "Whenever a regulation results in a physical appropriation of property, a per se taking has occurred, and Penn Central has no place." Regulatory takings beyond that point are outside this guide.
Tax foreclosure surplus: Tyler and Pung
In Tyler v. Hennepin County, 598 U.S. 631 (2023), the Court held that "Minnesota may not extinguish a property interest that it recognizes everywhere else to avoid paying just compensation when it is the one doing the taking." The Court later summarized Tyler as holding that the Takings Clause "requires the government to return any surplus proceeds from tax foreclosure sales, i. e., the difference between the sale price and the taxpayer's debt."
On June 23, 2026, Pung v. Isabella County, No. 25-95, addressed the measure of compensation after a tax sale: "We conclude that the proper baseline under the Takings Clause is the price obtained in a tax sale, at least when the sale is fairly conducted in light of our country's history of tax sales." The Court also held that the Eighth Amendment's Excessive Fines Clause does not require the government "to return more than the surplus proceeds."
Permit conditions: Sheetz
In Sheetz v. County of El Dorado, 601 U.S. 267 (2024), the Court held that "The Takings Clause does not distinguish between legislative and administrative permit conditions."
The Uniform Relocation Act (federally funded projects only)
The Uniform Relocation Assistance and Real Property Acquisition Policies Act (42 U.S.C. 4601 and following) applies to federal acquisitions and to state and local projects that use federal money. A state or local agency receiving federal assistance must give assurances that it will be guided by the federal acquisition policies "to the greatest extent practicable under State law" (42 U.S.C. 4655(a)), and that displaced people will receive relocation payments "as are required to be provided by a Federal agency" (42 U.S.C. 4630). A purely state-funded taking follows the state's own relocation law instead.
The federal acquisition policies (42 U.S.C. 4651) include:
- Appraisal first. The property "shall be appraised before the initiation of negotiations," and the owner may accompany the appraiser, with a waiver for low-value acquisitions (4651(2)). The regulation allows a waiver where the anticipated value is estimated at $15,000 or less, and the federal funding agency may approve waivers up to $35,000 when the owner is offered an appraisal, or up to $50,000 project by project (49 C.F.R. 24.102(c)(2)).
- A written offer of at least the appraisal. The agency must make a prompt offer, which "In no event shall" be "less than the agency's approved appraisal of the fair market value," with a written statement of the basis for it (4651(3)).
- No coercion. An agency may not "advance the time of condemnation, or defer negotiations or condemnation" or take "any other action coercive in nature, in order to compel an agreement on the price" (4651(7)).
- Payment before possession. No owner must surrender possession before the agency pays the agreed price or deposits at least its approved appraisal or the award in court (4651(4)).
- Ninety days' notice to move. The regulation states: "No lawful occupant shall be required to move unless he or she has received at least 90 days advance written notice of the earliest date by which he or she may be required to move" (49 C.F.R. 24.203(c)).
The relocation payment limits were raised by a Federal Highway Administration rule effective June 3, 2024 (89 Fed. Reg. 36908), which adjusted the statutory amounts using June 2023 CPI-U figures. Under 49 C.F.R. part 24 as amended by that rule:
| Payment | Limit | Regulation |
|---|---|---|
| Replacement housing payment, 90-day homeowner-occupant | Up to $41,200 (statute: $31,000, as adjusted by regulation) | 49 C.F.R. 24.401(b); 42 U.S.C. 4623(a)(1) |
| Rental or down payment assistance, tenants and certain others | Up to $9,570 (statute: $7,200, as adjusted) | 49 C.F.R. 24.402(a); 42 U.S.C. 4624(a) |
| Reestablishment expenses, small business, farm or nonprofit | Up to $33,200 | 49 C.F.R. 24.304 |
| Fixed payment in lieu of moving expenses, business or farm | $1,000 to $53,200 (nonprofits may choose the same range) | 49 C.F.R. 24.305(a), (d) |
| Tenant rental application fees and credit reports | Up to $1,000 | 49 C.F.R. 24.301(g)(7) |
| Business or farm search expenses | Up to $5,000 | 49 C.F.R. 24.301(g)(18) |
| Mobile home owner-occupant replacement housing | Up to $41,200 | 49 C.F.R. 24.502(a) |
The regulation lets the lead agency adjust these limits for the cost of living and inflation (49 C.F.R. 24.11(b)).
How the States Limit Takings After Kelo
The differences among the states show up when condemned property would end up with a private owner. Each state below links to its own page in the table further down; this section groups the states by the kind of limit their state page describes.

Broad limits on economic-development takings (30 states)
These states exclude economic development, or private-to-private transfers, from public use in general terms, by statute, constitution or court decision. Nearly all keep exceptions for utilities, common carriers and blight.
- Alabama (since 2005): no condemnation for nongovernmental retail, office, commercial, residential or industrial development or use; the bar does not apply to blight takings under redevelopment or urban renewal plans or to takings by or for utilities.
- Alaska (actions filed on or after October 3, 2006): no taking from one private person to transfer title to another for economic development, unless one of six listed exceptions applies; the legislature may still approve a restricted taking in a single-subject act.
- Arizona (Proposition 207): public use excludes "the public benefits of economic development"; utilities remain a public use, and courts decide public use regardless of any legislative assertion.
- Arkansas (Act 945 of 2021): the general eminent-domain chapter excludes takings for the economic benefit of the general public; blight remediation and abandoned-property resale are listed public uses.
- Colorado (2006): public use excludes a transfer to a private entity for economic development or tax revenue; a blight taking needs clear and convincing proof that it is necessary.
- Delaware: public use does not include generating revenue, tax base, employment or economic health through private owners; utilities, electric cooperatives, common carriers and qualifying blight removal are included, and qualifying DelDOT transportation acquisitions and DNREC, tax-ditch and tax-lagoon acquisitions are exempt.
- Florida: no taking to abate a public nuisance or for slum or blight; for petitions filed on or after January 2, 2007, no conveyance of condemned property to a private party except as a general law passed by three-fifths of each house provides, and the statute lists permitted uses such as common carriers and utilities.
- Georgia (since 2006): economic development is not a public use; roads, utilities and blight remedies remain, and counties and cities may condemn blighted property after a court blight determination.
- Idaho: no taking for a pretextual transfer to a private party or for economic development, with exceptions; urban renewal and housing-area takings need clear and convincing proof of three hazard conditions.
- Indiana (2006): economic development is not a public use, and a private-to-private transfer taking is allowed only on the chapter's conditions.
- Iowa (since 2006): public use does not mean economic development except as the definition specifically includes it, such as qualifying slum or blight acquisitions; agricultural land cannot be condemned for private development without the owner's consent, with listed carve-outs such as roads, state-supervised railways, airports and most utilities under the Iowa Utilities Commission.
- Kansas (since July 1, 2007): no taking to sell, lease or transfer property to a private entity except in six listed situations, such as utilities, pipelines and railroads to the extent the property is used for facilities necessary to provide service.
- Kentucky (2006): no condemnation for transfer to a private owner for economic development that benefits the public only indirectly; blight removal, utilities and common carriers remain public uses, and acquisitions financed by state road or federal highway funds are exempt.
- Louisiana (2006 amendments): the state and its subdivisions may not take property for predominant private use or for transfer to a private person, except as the constitution specifically authorizes, and economic development cannot count toward a public purpose. In 2026 the Louisiana Supreme Court held that a port's taking of land to lease to a private company for its exclusive use was not for a public purpose (Plaquemines Port Harbor & Terminal Dist. v. Nguyen).
- Maine (2006, applying retroactively to June 23, 2005): no condemnation of farm, fishing or forest land, or land with homes or other structures, for private development, mainly for tax revenue, or for transfer to a private person or for-profit business; blight-plan and utility takings are excepted.
- Michigan (2006 constitutional amendment): public use excludes a transfer to a private entity for economic development or tax revenue; a taking for transfer to a private entity can qualify only under one of three public-attribute tests.
- Minnesota: public use is defined exclusively, and economic development benefits do not by themselves make a use public; blight, contamination, abandoned property and public nuisances remain public uses.
- Missouri: no taking for solely economic development purposes; eliminating blight is excluded from that definition, and farmland may not be declared blighted for eminent domain.
- Nebraska (2006): no taking primarily for an economic development purpose; exceptions include public, right-of-way, pipeline and transmission-line projects, utility or railroad use and blight takings of non-agricultural land.
- Nevada (2008 constitution): public use does not include the direct or indirect transfer of condemned property from one private party to another, and the government must prove public use. In 2024 the Nevada Supreme Court held that this does not stop an investor-owned utility from taking an easement for a natural gas pipeline.
- New Hampshire (2006 constitution): no taking to transfer property to another person for private development or other private use; the statute excludes economic development benefits from public use, except for utility and common-carrier acquisitions and incidental private use.
- North Dakota: economic development is not a public use, and property may not be taken for a private individual or entity unless necessary for a common carrier or utility business.
- Ohio (since 2007): public use generally excludes takings for a private commercial enterprise, economic development or revenue, with exceptions for utilities, common carriers, certain port authority occupants and property proved to be blighted.
- Oklahoma: taking property for economic development alone, not in connection with removing blighted property, is not a public use under the state constitution (Board of County Commissioners v. Lowery, 2006).
- Pennsylvania (Act 34 of 2006): no taking in order to use property for private enterprise, with listed exceptions, including utilities, railroads, common carriers, blight, abandoned property, roads, and an owner who consents or does not file or does not prevail on preliminary objections.
- South Carolina (2006 vote, ratified 2007): no condemnation for any purpose or benefit, including economic development, unless it is for public use; a blight exception lets the legislature allow condemned property to go to public or private use.
- Tennessee (rewritten 2024, narrowed 2025): public use excludes private use, the indirect benefits of private economic development and recreational facilities and parks, with exceptions for transportation, utilities, common carriers, housing-authority redevelopment (narrowed in 2025 to blighted property or property that is for public use), state parks and natural areas, brownfield projects and incidental private use.
- Texas: no taking to confer a private benefit, as a pretext, or for economic development (subject to a narrow slum and blight exception); transportation projects, utilities, common carrier pipelines and other listed purposes are carved out.
- Vermont: no governmental or private entity may take property primarily for economic development, unless under the urban renewal chapter; condemnation for transportation, public utility, public property, building, hospital and park, and water, drainage and waste disposal projects is not affected.
- Virginia (constitution): outside utility, common carrier and railroad takings, a taking is not for public use if its primary use is private gain, private benefit, private enterprise, jobs, tax revenue or economic development, except to eliminate a public nuisance on the property; the condemnor must prove public use with no presumption that it exists.
Narrower limits (16 states)
These states restrict particular condemnors, particular property, later transfers, or the procedure, rather than barring economic-development takings across the board.
- California (Proposition 99): an owner-occupied residence may not be taken to convey it to a private person, but the bar does not apply to public works and improvements (including utility and common-carrier projects), public health and safety and other listed purposes.
- Connecticut (property acquired on or after June 25, 2007): redevelopment and municipal development agencies may not take property for the primary purpose of increasing local tax revenue, and some takings need a two-thirds vote of the municipality's legislative body.
- Illinois: a taking for private ownership or control generally requires clear and convincing proof that it is primarily for the public's benefit and necessary for a public purpose; blight, utility and several listed project types follow other rules.
- Mississippi (Section 17A, 2011): property acquired by eminent domain may not be transferred to a private person or business for ten years, with exceptions for utilities, roads, common carriers and similar uses; it limits later transfers rather than banning economic-development takings, and public use is a judicial question.
- Montana: a condemnor must prove the use is one listed in the statute and that the taking is necessary; urban renewal takings are limited to statutory blight and may not be used to raise tax revenue.
- New Jersey: redevelopment of blighted areas is a public use, but property cannot be taken solely because it is not used optimally (Gallenthin, 2007); for areas designated after a 2013 law, a town may condemn only in a properly noticed Condemnation Redevelopment Area.
- New Mexico (effective June 15, 2007): eminent domain was removed from the Metropolitan Redevelopment Code and two redevelopment laws were repealed; other condemnors, such as pipeline companies, keep the powers their own statutes grant.
- North Carolina (2006): the purposes listed in the condemnation statute are the exclusive uses for which eminent domain is granted, and a redevelopment commission may condemn only a blighted parcel.
- Oregon: a public body may not condemn property used as a residence, business, farm or forest operation when it intends at that time to convey an interest to another private party, with exceptions for dangerous property and transportation and utility facilities; the bar does not bind private companies with condemnation power.
- Rhode Island (2008): takings for economic development need explicit authority, a plan adopted after notice, a hearing and a comment period, and approval by the council or the General Assembly, with exceptions for local redevelopment agencies and short partial takings; owners receive at least 150 percent of fair market value.
- South Dakota (2006): counties, municipalities and housing and redevelopment commissions may not condemn property for transfer to a private party or primarily to enhance tax revenue; there is no statewide bar on every condemnor and none in the constitution.
- Utah: a redevelopment agency may not use eminent domain except in listed situations, such as within an urban renewal project area after a development impediment determination.
- Washington: the constitution bars taking private property for private use, except private ways of necessity and certain drains, flumes and ditches; public use is a judicial question, and blighted property a county, city or town condemns may later be transferred for private uses.
- West Virginia (2006): for the State's general taking power, public use does not mean eminent domain primarily for private economic development; transfers to entities that themselves hold condemnation power are excepted, and urban renewal authorities may condemn only in slum or blighted areas.
- Wisconsin: listed condemnors may not condemn property that is not blighted if they intend to convey or lease it to a private entity, and a municipality may not take even blighted property outside its boundaries for that purpose.
- Wyoming: for takings under W.S. 1-26-801 only, public purpose excludes a public entity taking property to transfer it to another private party, except to protect public health and safety; utilities and pipeline companies condemn under other sections.
No general post-Kelo limit (5 jurisdictions)
- District of Columbia: the condemnation chapter allows takings for "any other authorized municipal use" and contains no economic-development bar; site-specific Council authorizations and a slum-and-blight acquisition route exist.
- Hawaii: neither the constitution nor the condemnation chapter bars economic-development takings; the Hawaii Supreme Court defers substantially to the government's stated purpose but has said courts should consider a pretext defense where there is evidence of pretext (County of Hawai'i v. C & J Coupe, 2008).
- Maryland: no general ban in the constitution or condemnation title, but the courts read the constitution to bar takings for purely private use, local urban-renewal takings are limited to slum or blighted areas, and a 2007 act requires a condemnor to file within 4 years of its specific authorization.
- Massachusetts: no post-Kelo limit in the eminent domain chapters; the Supreme Judicial Court has held that bad faith includes a taking made solely for an improper reason, even when the stated purpose is valid.
- New York: the Eminent Domain Procedure Law asks whether an acquisition will serve a public use, benefit or purpose, and the Court of Appeals gives deference to an agency's findings supporting a taking.
Can a Pipeline or Utility Company Use Eminent Domain?
Often yes. The state limits described above usually carve out utilities and common carriers, and several state statutes expressly give pipeline companies the power. Interstate natural gas pipelines can also condemn under the federal Natural Gas Act, as described above. The state pages show the details, and some states have moved in different directions:
- North Dakota lists carbon dioxide pipelines as an eminent-domain purpose and treats a carbon dioxide pipeline operating for the public for hire as a common carrier.
- South Dakota barred eminent domain in 2025 for any pipeline whose preponderant purpose is transporting carbon oxide.
- Oklahoma barred eminent domain from November 1, 2025 for siting or building wind, solar, battery storage, hydrogen or other renewable energy facilities on private property.
- Indiana pays 125 percent of fair market value for agricultural land and 150 percent for an owner-occupied residence taken for a carbon dioxide pipeline.
- Iowa limits a pipeline right-of-way generally to 75 feet and one acre in any one location plus station sites, unless the utilities commission approves more on a showing of need.
- West Virginia bars a pipeline or oil or gas tank within 100 feet of an occupied dwelling without consent, outside municipalities.
- Nevada's Supreme Court held in 2024 that the state's private-transfer bar does not stop an investor-owned utility from taking an easement for a natural gas pipeline.
How Just Compensation Is Decided in the States
The usual measure is fair market value. In a partial taking, states add damages to the land that remains, and many reduce those damages by benefits the project brings to the remainder; others do not. Ohio's constitution has a jury assess compensation without deduction for benefits and Mississippi does not reduce remainder damages for supposed project benefits, while South Carolina considers project benefits and North Dakota offsets benefits only when the state or a public corporation takes.
The valuation date varies. Examples from the state pages: the date the summons issues in Alaska and Hawaii, the date the complaint or petition is filed in Mississippi and North Carolina (generally also in Illinois), the date of trial or the date title passes, whichever comes first, in Florida, and the date of the taking in North Dakota.
Who sets the number also varies. Some states start with court-appointed commissioners or appraisers (Alabama, Kansas, Nebraska, New Jersey, Oklahoma and Texas among them), with a trial available after an objection or appeal. Others send the case straight to a jury: Florida uses a jury of 12, Arkansas a 12-person jury, and the District of Columbia a jury of five.
Extra payments for homes and family land
For most states, the state page shows no percentage premium for a home. These states pay a stated percentage above it for certain takings:
- Michigan: not less than 125 percent of fair market value when an individual's principal residence is taken, or when the taking leaves less land than the local zoning minimum lot size.
- Missouri (proceedings filed after December 31, 2006): the highest of fair market value, 125 percent for a homestead taking, or fair market value plus a 50 percent heritage value for property held in the same family for 50 or more years when the taking prevents use in substantially the same manner; a separate 150 percent rule applies to certain farmland taken by non-cooperative electrical corporations.
- Indiana: in takings under the 2006 private-transfer chapter, 150 percent of fair market value for residential property and 125 percent (or equal-acreage replacement land, if both sides agree) for agricultural land.
- Rhode Island: at least 150 percent of fair market value plus transfer and relocation costs in economic-development takings.
- Connecticut: 125 percent of the averaged appraisals, but only for takings under Conn. Gen. Stat. § 8-193 and condemnations under § 32-224 of property acquired on or after June 25, 2007, and on federally funded projects only to the extent federal law allows.
New Hampshire adds relocation and housing replacement expenses of up to 10 percent of the compensation when a utility takes an owner's home in certain substation or transmission-line cases. Ohio's statute uses a 125 percent figure, but as a trigger for capped fee shifting, not as a bonus.
Quick-Take: When the Condemnor Can Take Possession Before Trial
Many states let a condemnor take title or possession before compensation is finally set, once it deposits its estimate or an interim award. Examples from the state pages:
- Florida: listed public bodies, cooperatives, public utility corporations and companies other statutes authorize, such as natural gas companies, may use quick-take, and title vests on deposit; a defendant who does not request a hearing waives objections to the order of taking.
- Texas: after the special commissioners' award, the condemnor may take possession pending further litigation by paying or depositing the award (and, unless exempt, posting additional deposits or bonds).
- Alabama: an appeal does not keep the condemnor off the land if it pays the assessed damages into probate court with a bond in double that amount, or deposits the award and costs in circuit court.
- Kansas: title vests when the condemner pays the appraisers' award to the clerk.
- North Carolina: in Department of Transportation cases, title passes on filing of the complaint and declaration of taking with the deposit.
- Oregon: an owner who objects to a public condemner's immediate possession must file a written objection within 10 days after notice is served.
Where a state requires payment first, the rule can be strict. Iowa does not allow dispossession from a residence, its outbuildings, orchard or garden until damages are finally determined and paid, with a separate rule for state highway takings.
Will the Owner's Attorney Fees Be Paid?
Whether a condemnor pays the owner's lawyer depends on the state statute, and the statutes differ widely. Florida works differently: except as its statutes otherwise provide, the condemning authority pays the owner's attorney fees based on the benefits achieved, at 33 percent of the benefit up to $250,000, 25 percent of the portion between $250,000 and $1 million, and 20 percent above $1 million.
Fees when the award beats the offer
Many states shift fees when the final award beats the condemnor's offer or deposit by a set margin. Examples:
- Alaska: an award at least 10 percent larger than the amount deposited or the master's allowance appealed from (one of five listed situations).
- Arkansas: an award 20 percent or more above the written good-faith offer.
- Colorado: an award over $10,000 that equals or exceeds 130 percent of the last written offer made before filing.
- Iowa: a commission award over 110 percent of the agency's final offer, applied for before the final commission meeting adjourns.
- Michigan: an award above the good faith written offer, with fees capped at one-third of the difference.
- Minnesota: mandatory when the award is more than 40 percent above the last written offer, discretionary at 20 to 40 percent, and not available when the award is $25,000 or less.
- Nebraska: discretionary when an owner's appeal beats the appraisers' award by 15 percent.
- South Dakota: an award 20 percent greater than the final offer filed when trial starts, with a total award over $700.
- Washington: no written settlement offer at least 30 days before trial, or a judgment 10 percent or more above the highest written offer in effect then, unless the owner did not stipulate to possession after a written request.
- Wyoming: fair market value above 115 percent of the final offer, covering expenses after that offer.
Other formulas compare the result with something else. Utah measures against the owner's own last settlement offer (up to one-third of the difference, capped at $50,000 or $100,000). Delaware asks whether the award is closer to the owner's highest trial valuation than to the condemnor's pretrial offer. California awards fees if the court finds the condemnor's final offer unreasonable and the owner's final demand reasonable. Ohio's capped fees turn on an award above 125 percent of the offer, with exceptions for exigency, road and rail takings.
Fees mainly when the taking fails or is abandoned
In other states the main fee triggers are a condemnation that fails, is dismissed or is abandoned, or an owner's win in an inverse condemnation suit. Georgia, Maryland, New Jersey, North Carolina and Mississippi follow this pattern on their state pages, and Hawaii awards fees when a case is abandoned or discontinued or the property is not finally taken. Nevada's general rule is that each side pays its own fees, with an award to the owner on abandonment, and its constitution provides that the owner is never liable for the government's fees or costs.
Little or no fee shifting
West Virginia's condemnation chapter contains no provision awarding the owner attorney fees. In Massachusetts, the cost rules in the main condemnation chapter shift taxable costs, and neither section provides for attorney fees. Kentucky charges circuit court costs to the condemnor, but its Supreme Court has held that "all costs" in the dismissal provision does not include attorney fees. Virginia lets a court order certain costs and expert fees, but not attorney fees, when the award is 25 percent or more above the initial written offer, except when a utility or railroad takes less than a fee simple for under $10,000.
Buy-Back and Repurchase Rights
If the government condemns land and never uses it, some states give the former owner a chance to buy it back. The terms vary sharply:
- Price paid: Alabama offers unused land that is later sold at the price paid, less listed taxes, with 90 days to accept; Kentucky allows repurchase at the price paid if development does not start within 8 years; Texas allows repurchase at the price paid on listed grounds, including no actual progress within 10 years.
- Current value: New York's right of first refusal is at current fair market value and applies only to fee acquisitions where the project is abandoned; Ohio's is at appraised fair market value and ends after events including five years from the taking.
- Price plus interest: Virginia sets the price at the amount paid plus 6 percent annual interest plus improvements, never above fair market value; Oregon's formula for the whole property is the compensation and damages paid plus 7 percent a year.
- Long windows: Louisiana requires a first offer to the original owner or heir before a sale or lease within 30 years, with stated exceptions; Pennsylvania's offer-back runs 10 years for undeveloped property and 21 years for agricultural property.
Maryland's condemnation title, North Dakota's condemnation chapter and South Carolina's Eminent Domain Procedure Act contain no repurchase right. Short acceptance windows are common: 30 days in Montana, New Mexico, Oregon (for an offer of the entire parcel) and Tennessee (local governments), 60 days in Iowa and in Washington school district acquisitions.
Owner Deadlines and Waiver Traps
Condemnation deadlines are often far shorter than ordinary lawsuit deadlines, and missing one can end an objection. Examples from the state pages:

- Challenging the taking itself: 20 days to answer in Alaska and Delaware, 21 days in Virginia and the District of Columbia, 30 days in Nevada and Pennsylvania (preliminary objections), a separate action within 30 days in South Carolina, and 40 days from the jurisdictional offer in Wisconsin. In New York, review goes to the Appellate Division within 30 days after the condemnor publishes its findings, limited to issues raised at the hearing.
- Very short windows: 5 days in Delaware to move to set aside the commissioners' award, 5 days in Washington state condemnations to seek review of the public-use order, 10 days in Hawaii to raise public use after an immediate-possession order, and in Mississippi a motion to dismiss at least 5 days before the hearing.
- Appealing the award: 10 calendar days plus 3 for mailing from a special master's award in Georgia, 20 days in New Hampshire and New Jersey, 30 days in Alabama, Iowa, Kansas and Nebraska, and 40 days in Minnesota. In Texas, objections are due on or before the first Monday after the 20th day after the commissioners file their findings.
- Long or unusual windows: North Carolina gives 120 days to answer a Chapter 40A complaint and 12 months in Department of Transportation cases, but missing the deadline admits the deposit is just compensation. Massachusetts generally gives three years from vesting to petition for damages, and Rhode Island one year in state takings.
Withdrawing money can also waive defenses. In Arizona, Hawaii, Nevada, New Hampshire, New Mexico, North Dakota, South Carolina, Utah and Wyoming, taking the condemnor's deposit or payment gives up every objection except the claim for more compensation. In Colorado, an owner who takes the award before an appeal is decided generally has the appeal dismissed as to that owner, and in Oregon withdrawing the compensation awarded waives an appeal. Several states, including Alaska, Kansas, Kentucky, Missouri and Nevada, require an owner to repay any amount received above a later, lower award.
Some states also treat silence on pre-suit steps as a waiver. In Alabama, a condemnor's failure to follow the appraisal and offer rules is waived if the owner, exercising reasonable diligence, does not object; in Wyoming, an owner who does not respond to the initial written offer may lose the right to object to the condemnor's good faith.
Inverse Condemnation: When Property Is Taken Without a Case
When government takes or damages property without filing a condemnation case, the owner may sue for compensation. The deadline depends on the state. Examples: one year generally in Arizona, two years for claims against the State in Hawaii, 24 months from the taking or project completion in North Carolina, three years in Mississippi, New Mexico (against a public body) and Virginia, four years in Idaho, five years in Iowa, six years in North Dakota, Oregon, Pennsylvania and Vermont (ordinarily six years in New Jersey), 10 years in Missouri for real property, and 15 years in Kansas and Nevada.
Several states award the owner's fees after a successful inverse condemnation suit, including North Carolina and Delaware, and in Georgia and New Mexico on federally assisted projects. Hawaii's Supreme Court held in 2025 that attorneys' fees cannot be awarded against the State in an inverse condemnation suit.
Relocation Help Under State Law
On a federally assisted project, the federal caps above apply. On a project paid for only with state or local money, the state's own relocation law controls, and the figures differ. Examples from the state pages:
- Alabama (state agencies), Delaware, New Hampshire, North Carolina and North Dakota: replacement housing payments of up to $22,500 for an owner-occupant of at least 180 days, with conditions.
- Maryland: generally up to $45,000 for a displaced owner-occupant of at least 180 days, which the agency may exceed case by case.
- Massachusetts: moving costs plus up to $15,000 for a 180-day owner-occupant who buys a replacement within one year.
- Pennsylvania: up to $31,000 for a 90-day owner-occupant and up to $7,200 in rental assistance for a tenant.
- Wisconsin: owner-occupant replacement housing generally up to $25,000, more if needed for a comparable dwelling.
- Utah: reestablishment expenses capped at $75,000 since May 6, 2026, adjusted yearly from July 1, 2027.
- Minnesota pays relocation benefits under the federal act even without federal funding, and Illinois measures relocation costs under the federal act unless federal funds pay direct assistance.
Eminent Domain Laws by State: Comparison Table
Cells summarize each state page; follow the link for the statute, the exceptions and the full deadline list. "See state page" means the point is covered there or is not summarized here.
| State | Economic-development takings | Attorney fees for the owner | Buy-back right | Notable owner deadline |
|---|---|---|---|---|
| Alabama | Barred since 2005 for private retail, office, commercial, residential or industrial development; blight plans and utilities excepted | Mandatory on dismissal in whole or part and in inverse condemnation; also late payment and other listed cases | Unused land later sold is first offered at the price paid, less listed taxes; 90 days to accept | 30 days to appeal the probate order; pre-suit appraisal and offer defects waived if not raised |
| Alaska | Barred for private-to-private economic development transfers in actions filed on or after Oct. 3, 2006, with six exceptions | In five listed situations, including an award at least 10% above the deposit or master's allowance appealed from | See state page | 20 days after service to answer, or objections to the taking are waived |
| Arizona | Not a public use (Proposition 207); utilities remain a public use | Owner never liable to the state or a subdivision for fees; awarded if the use is not public, the condemnor cannot acquire or abandons, and in listed slum-clearance cases | See state page | Inverse condemnation generally 1 year; taking money paid on a judgment abandons defenses except greater compensation |
| Arkansas | Excluded from public use under the general chapter since Act 945 of 2021; blight remediation is a listed public use | If the award beats the written offer by 20% or more (highway quick-take: the deposit); county and city cases follow their own statutes | Highway surplus: 60-day option; closed schools: one-year option | 180 days after notice to challenge a state agency taking (not ArDOT); highway quick-take motion to strike within the later of the return day or 20 days |
| California | Owner-occupied homes may not be taken to convey to a private person (Prop 99), except public works and listed purposes | If the condemnor's final offer is unreasonable and the owner's final demand reasonable; also on dismissal, with exceptions | Unused property generally sold after 10 years; former owner has a right of first refusal in listed circumstances | Final offer and demand filed at least 20 days before the compensation trial; fee motion within 30 days after judgment |
| Colorado | Not a public use when transferred to a private entity for economic development or tax revenue (2006) | Award over $10,000 and at least 130% of the last pre-filing written offer (some right-of-way cases excluded), or no authority to take | See state page | 30 days to challenge an urban renewal blight finding; taking the award before an appeal is decided generally ends the appeal |
| Connecticut | For property acquired on or after June 25, 2007, redevelopment agencies may not take primarily to raise local tax revenue | Varies by condemnor, e.g. when a state agency's taking fails or is abandoned, or in an inverse condemnation win against the state | See state page | 6 months to seek court review of a redevelopment agency's compensation statement or a state highway assessment |
| Delaware | Excluded from public use; utilities, common carriers and qualifying blight removal included; DelDOT and DNREC exemptions | If the award is closer to the owner's highest trial valuation than the pretrial offer (apply within 15 days, capped at the award); also failed or abandoned agency cases | See state page | 20 days to answer (objections not raised are waived); 5 days to move to set aside the commissioners' award |
| District of Columbia | No economic-development bar in the condemnation chapter | In the condemnation chapter, only when the District abandons, unless the owner asked for or consented to it | See state page | 21 days to answer (objections not stated are waived); 20 days to object to the jury's appraisement |
| Florida | No taking for nuisance or slum or blight; no conveyance to a private party for petitions filed on or after Jan. 2, 2007, except as general law allows | Condemning authority generally pays on a benefits-achieved schedule (33% / 25% / 20%), with statutory exceptions | See state page | At least 30 days to respond to the presuit offer; in quick-take, not requesting a hearing waives objections to the order of taking |
| Georgia | Not a public use since 2006; blight condemnation after a court blight determination | When the condemnor cannot acquire or abandons; no general rule for an award above the offer | After 5 years without public use, written application within one year of the condemnor's notice (listed takings excluded) | 10 calendar days plus 3 for mailing to appeal a special master's award |
| Hawaii | No bar in the constitution or condemnation chapter; courts consider a pretext defense | When the case is abandoned or discontinued or the property is not finally taken; not against the State in inverse condemnation | See state page | 10 days after an immediate-possession order to raise public use; 2 years for inverse condemnation against the State |
| Idaho | Barred for pretextual transfers to a private party or economic development, with exceptions | Discretionary; the rights notice says the court may award fees if compensation beats the last timely offer by 10% or more | See state page | 90 days after service to send a written business-damages claim in a partial taking |
| Illinois | Taking for private ownership or control generally needs clear and convincing proof of primary public benefit; blight and others follow other rules | When the taking fails or is dismissed; physical takings in court-ordered condemnation; a net-benefit formula in certain private-ownership takings | See state page | Jury demand by the summons return date; blight challenge within 6 months; quick-take authority order appealed within 30 days unless extended |
| Indiana | Not a public use under the 2006 chapter, which allows private-transfer takings only on its conditions | If, after trial, the judgment beats the last offer: up to the lesser of $25,000 or the property's value; other listed cases | See state page | 30 days after the notice is served to object; exceptions to the appraisers' report 45 days after mailing (10 days in some government cases) |
| Iowa | Not a public use since 2006, except as defined (e.g. qualifying slum or blight); farmland not taken for private development without consent | Commission award over 110% of the final pre-condemnation offer (apply before the final meeting adjourns); other listed cases | First offer of unused land, 60 days to buy; five-year nonuse reoffer, 180 days (street and highway projects excluded) | 30 days after service of the notice of assessment to challenge the right to take; 30 days from mailing to appeal the award |
| Kansas | Transfer to a private entity barred since July 1, 2007, except six listed situations | Court may allow them when the condemner appeals and the jury awards more; defense expenses if the case is abandoned for nonpayment | See state page | 30 days after the appraisers' report is filed to appeal, with copies mailed within 7 days |
| Kentucky | Barred for transfer to a private owner for economic development that benefits the public only indirectly (2006); blight, utilities and carriers remain public uses; highway-funded acquisitions exempt | Court costs go to the condemnor, but not attorney fees; fees for a violation of the negotiation rule | If development does not start within 8 years, repurchase at the price paid (with exceptions) | 20 days to answer on the right to take; 30 days after the interlocutory judgment for exceptions |
| Louisiana | Barred for predominant private use or transfer to a private person (2006); economic development cannot count as public purpose | Mandatory if under 50% is acquired or the suit is abandoned; discretionary if the highest offer is below the award | First offer to the original owner or heir before a sale or lease within 30 years, with exceptions | Depends on the condemnor: 30, 15 or 20 days; missing it waives every defense except compensation |
| Maine | Barred for listed land for private development, tax revenue or private transfer (2006); blight plans and utilities excepted | No general rule; listed highway cases and high-impact transmission line takings | Right of first refusal if the land is not used for its purpose; 90 days to respond; exemptions | Highway takings: 30 days to appeal a Claims Commission award |
| Maryland | No general ban; purely private takings barred by case law; urban renewal limited to slum or blight | When the owner wins on the right to condemn or the condemnor abandons | None in the condemnation title | See state page |
| Massachusetts | No post-Kelo limit in the eminent domain chapters | Taxable costs only in the main cost sections; no attorney-fee provision there | See state page | Generally 3 years from vesting to petition for damages; 6-month windows without timely notice |
| Michigan | Not a public use since 2006 for transfer to a private entity for economic development; three public-attribute tests | If the award beats the good faith written offer, up to one-third of the excess; actual fees if the acquisition is improper | See state page | Necessity challenge within the time to respond to the complaint; added claims within 90 days after the offer or 180 days after service, whichever is later |
| Minnesota | Economic development benefits do not by themselves make a use public; blight and contamination remain public uses | Mandatory above 40% over the last pre-petition offer, discretionary at 20% to 40%, none at $25,000 or less; most public service corporation projects exempt | See state page | 60 days after service of the order to appeal public use; 40 days after the commissioners' report to appeal the award |
| Mississippi | Transfer to a private party barred for 10 years after acquisition (2011), with exceptions; does not ban economic-development takings as such | When the condemnor fails to pay in time, dismisses other than by settlement, or loses the right to condemn | Excess highway land: first right of refusal for a total-take owner, 45 days (highway easements excluded) | Motion to dismiss at least 5 days before the hearing; notice of appeal within 10 days of judgment |
| Missouri | Barred when solely for economic development; blight excluded; farmland cannot be declared blighted | Dismissal for lack of good-faith negotiation; abandonment under a post-2006 redevelopment plan; not merely because the award beats the offer | See state page | 30 days after notice of the commissioners' report to file exceptions |
| Montana | Only listed public uses; urban renewal limited to statutory blight and not to raise tax revenue | Mandatory if the taking is disallowed or the award exceeds the rejected final written offer | Non-fee interests revert on abandonment; 30-day option to buy at the highest bid when sold | 30 days after the preliminary condemnation order to file a compensation claim; 30 days to appeal the commissioners' award |
| Nebraska | Barred when primarily for economic development (2006), with exceptions such as pipelines, utilities and blight takings of non-agricultural land | Discretionary if the owner's appeal beats the award by 15%; mandatory without good-faith negotiation or public purpose | See state page | 30 days from the appraisers' report to appeal, with service, an affidavit and an undertaking |
| Nevada | Private-to-private transfer not a public use (2008 constitution); listed statutory exceptions' validity left open | Generally each side pays its own; owner awarded fees on abandonment; owner never liable for the government's fees | Reversion: 5 years from the final order (constitution); 15 years from possession (statute) | 30 days to answer; a public-use challenge must come before occupancy and construction |
| New Hampshire | Barred for transfer for private development or private use (2006 constitution); utility and carrier exceptions | Reasonable fees if the owner prevails solely on public use; damages with costs if objections end the case | Fee taken and purpose abandoned: offered back within 10 years (90 days to accept); other listed rules | 30 days after the return day for preliminary objections; 20 days to appeal the board's award |
| New Jersey | Blight redevelopment is a public use, but not property merely not used optimally; post-2013 areas need a Condemnation Redevelopment Area | Mandatory if the condemnor cannot condemn or abandons; discretionary in an owner's action to compel condemnation | See state page | 45 days to challenge a redevelopment determination; 20 days to appeal the commissioners' report |
| New Mexico | Eminent domain removed from the Metropolitan Redevelopment Code effective June 15, 2007 | Mandatory on abandonment, dismissal (other than settlement) or no right to take; no rule for an award above the offer in Chapter 42A | Excess land: elect within 30 days after notice (not for land wholly within a municipality) | 25 days to request a pre-suit appraisal; 10 days to object to a special-procedure order of entry |
| New York | No express bar; asks whether a public use, benefit or purpose is served, with deference to findings | Discretionary if the award is substantially above the condemnor's proof; mandatory on abandonment or lack of authority | Fee takings only: first refusal at current value if abandoned and sold for private use within 10 years | Where a hearing is required, 30 days after the condemnor publishes its findings, in the Appellate Division, limited to issues raised at the hearing |
| North Carolina | Listed purposes exclusive since 2006; redevelopment commissions may take only blighted parcels | When the condemnor is not authorized or abandons, and in a successful inverse condemnation suit | See state page | 120 days to answer (12 months for DOT); missing it admits the deposit is just compensation |
| North Dakota | Economic development not a public use; private takings only if necessary for a common carrier or utility | Generally discretionary; mandatory on listed dismissals and withdrawals | None in the condemnation chapter | Generally 21 days to answer; accepting payment abandons defenses except greater compensation |
| Ohio | Generally excluded from public use since 2007, with utility, carrier, port authority and proven-blight exceptions | Full fees if the owner wins on necessity or public use or the agency abandons; capped fees above 125% of the offer (exceptions) | Repurchase at appraised value if unused; ends on listed events, including 5 years after the taking | 10 business days to object to the notice of intent; answer generally 28 days after service |
| Oklahoma | Not a public use when for economic development alone (Lowery, 2006); renewable energy siting barred since Nov. 1, 2025 | Discretionary if a jury award beats the greater of the commissioners' award or the last timely offer by at least 10% | Unused publicly funded project land: first offer at the lesser of appraised value or original price, 90 days | 30 days after the commissioners' report for exceptions; 60 days to demand a jury |
| Oregon | Public bodies may not take a residence, business, farm or forest operation to convey to a private party, with exceptions | If the verdict beats the highest written pre-suit offer or the first offer was not in good faith; other listed cases | Set by the judgment or agreement; offer for the entire parcel must be accepted within 30 days | 10 days to object to immediate possession; owner's appraisal at least 60 days before trial |
| Pennsylvania | Taking for private enterprise prohibited since 2006, with listed exceptions | Full fees in listed situations; otherwise limited reimbursement up to $4,000 per property | Fee condemned and purpose abandoned: offer-back for 10 years (21 years for agricultural property) | 30 days after service of the notice to file preliminary objections; 30 days to appeal the viewers' report |
| Rhode Island | Allowed only with explicit authority, a plan, notice and hearing, and council or General Assembly approval (2008); exceptions for redevelopment agencies and short partial takings | See state page | State takings: former owner may buy or lease land no longer needed; 30 days to accept | 1 year from filing the description and statement to petition for a jury (state takings) |
| South Carolina | Barred unless for public use (2006 vote, 2007 ratification); blight exception | To an owner who wins a right-to-take challenge or prevails at trial as defined (apply within 15 days), or on abandonment | None in the Eminent Domain Procedure Act | Separate action within 30 days after the Condemnation Notice to challenge the right to take |
| South Dakota | Counties, municipalities and housing commissions may not condemn for private transfer or mainly tax revenue (2006); not statewide | In chapter 21-35 cases, if the award is 20% over the final offer and exceeds $700; also on dismissal | Surplus highway land reverts to the former owner when no longer required | 30 days from service of the summons to demand a hearing, or necessity is waived |
| Tennessee | Private use, indirect economic-development benefits, recreation and parks excluded (2024, narrowed 2025), with exceptions | Depends on the project type and how the case ends | Local governments must first offer unused land to the former owner; 30 days to sign | Generally 30 days after notice of the petition to answer on the right to take (outside road, transportation and utility projects, necessity challenges may be a separate action); 12 months for an owner's own suit after occupation |
| Texas | Barred for private benefit, pretext or economic development (narrow slum and blight exception); transportation, utilities and pipelines carved out | Only in listed situations, such as a condemnor dismissal or no bona fide offer | Price paid, on listed grounds, including no actual progress within 10 years | Objections by the first Monday after the 20th day after the commissioners file their findings |
| Utah | Redevelopment agencies may condemn only in listed situations | Up to one-third of the amount the award beats the owner's own last settlement offer, capped at $50,000 or $100,000; also on abandonment | Offer at the acquisition price, 90 days to accept, for property bought under threat after May 11, 2009 (exceptions) | Taking the deposit before judgment abandons defenses except greater compensation; settlement offer within 30 days after the condemnor's offer |
| Vermont | Barred when primarily for economic development, except urban renewal; transportation and utility projects unaffected | Highway takings: if the taking is unlawful or abandoned other than by settlement, or in an inverse condemnation win or settlement | See state page | Highway takings: 90 days from the notice of taking to contest compensation |
| Virginia | Not a public use if the primary use is private gain or economic development, outside utility, carrier and railroad takings | Listed cases, such as a defeated or abandoned taking by a state agency; discretionary expert costs, not attorney fees, if the award is 25% or more above the offer, except utility and railroad takings of less than a fee simple under $10,000 | Fee simple takings: price paid plus 6% a year plus improvements, capped at fair market value; 6 months to accept | 21 days after service to answer and object (late owners may still present value evidence) |
| Washington | Constitution bars taking for private use, except ways of necessity and certain drains, flumes and ditches | Mandatory with no written offer 30 days before trial or a judgment 10% over the highest offer, subject to a possession condition | School district acquisitions in listed situations: 60 days to accept | 5 days to seek review of a state public-use order; 60 days to demand trial after a stipulated possession order |
| West Virginia | For the State's general taking power, not for primarily private economic development (2006); urban renewal limited to slum or blight | No attorney-fee provision in the condemnation chapter | See state page | 10 days after the commissioners' report is filed to file exceptions and demand a jury |
| Wisconsin | Listed condemnors may not take non-blighted property to convey or lease to a private entity | In listed situations, including abandonment, no right to condemn and an unappealed commission award at least 15% and an indexed amount above the offer | See state page | 40 days from the jurisdictional offer to sue over the right to condemn |
| Wyoming | For W.S. 1-26-801 takings, public purpose excludes transfer to another private party, except health and safety | If the condemnor did not negotiate in good faith, or value tops 115% of the final offer (later expenses); other cases | See state page | Not responding to the initial written offer can forfeit a later good-faith objection |
Related Pages
- Easement laws by state
- Squatters rights and adverse possession by state
- Property records by state
- Statute of limitations in the United States
This guide provides general legal information about federal and state eminent domain law, not legal advice. Condemnation cases turn on the statute that authorizes the taking, the condemnor, the deadlines in the notice served and the facts of each property. For advice about a specific situation, contact a lawyer licensed in your state or the agency acquiring the property.
Last updated: 2026-10-21.
Frequently Asked Questions
Can the government take my property in the United States?
Yes, if the taking is for a public use and the owner receives just compensation. The Fifth Amendment says private property shall not "be taken for public use, without just compensation." States then set their own procedures, deadlines and limits on what counts as a public use.
Can a state take property and give it to a private developer?
Under the federal Constitution, Kelo v. City of New London (2005) held that a taking for a city economic development plan met the public-use requirement, but Kelo said states may restrict their own takings power further. Thirty states now broadly exclude economic development or private-to-private transfers from public use, 16 have narrower limits, and five jurisdictions (D.C., Hawaii, Maryland, Massachusetts and New York) have no general post-Kelo bar of that kind.
Can a pipeline company use eminent domain?
Often. A company holding a Natural Gas Act certificate that cannot buy a needed right-of-way by agreement may condemn it in federal or state court (15 U.S.C. 717f(h)), and PennEast (2021) held it can condemn necessary rights-of-way in which a state has an interest. State limits on private takings usually carve out utilities and common carriers, though South Dakota barred eminent domain in 2025 for pipelines whose preponderant purpose is carrying carbon oxide.
How is just compensation calculated?
The usual measure is fair market value, plus damages to the remaining land in a partial taking, sometimes reduced by project benefits. A few states pay more for certain takings, such as Michigan (not less than 125% for a principal residence), Missouri (125% for a homestead taking, or a heritage value for 50-year family land in some takings), Indiana and Rhode Island (150% in specified takings).
How long do I have to challenge an eminent domain taking?
It depends on the state and the condemnor, and the windows are often short: 20 days to answer in Alaska and Delaware, 21 days in Virginia, 30 days for preliminary objections in Pennsylvania, and 40 days from the jurisdictional offer in Wisconsin. Missing the deadline can waive objections to the taking. Each state page lists its deadlines.
Will the government pay my attorney fees in an eminent domain case?
Only where a statute says so. Some states pay fees when the award beats the offer by a set margin (for example 20% in Arkansas or 10% in Washington), others mainly when the taking fails or is abandoned, Florida pays on a benefits-achieved schedule, and West Virginia's condemnation chapter has no attorney-fee provision.
What relocation help is available when property is taken?
On federal and federally assisted projects, the Uniform Relocation Act applies: under 49 C.F.R. part 24 as amended effective June 3, 2024, a 90-day homeowner-occupant's replacement housing payment may not exceed $41,200 and a tenant's rental assistance may not exceed $9,570, with at least 90 days' written notice before a required move. Purely state-funded takings follow state relocation laws, which set different amounts.
What is inverse condemnation?
It is a lawsuit by an owner whose property was taken or damaged without a formal condemnation case. Claims against the United States go to the Court of Federal Claims under the Tucker Act, and claims against a state or local government follow that state's cause of action and deadline, which ranges from about one year in Arizona to 15 years in Kansas and Nevada.
Can I buy my land back if the government does not use it?
In some states. Examples: Kentucky allows repurchase at the price paid if development does not start within 8 years, Texas allows repurchase at the price paid on listed grounds including no actual progress within 10 years, and New York gives a right of first refusal at current value in limited cases. Maryland, North Dakota and South Carolina have no repurchase right in their main condemnation laws.
What did the Supreme Court decide in Pung v. Isabella County?
On June 23, 2026, the Court held that after a tax-foreclosure sale, the just-compensation baseline is the price obtained at the sale, at least when the sale is fairly conducted. Tyler v. Hennepin County (2023) had already held that the government must return surplus proceeds above the tax debt.
Updates
Independently fact-checked against the cited primary sources
The Law Behind This Article
This article rests on the statutory provisions below, held in our own legal record and retrieved from the official source. Tap a section to read the operative text.
United States Code Title 42
§ 4651Uniform policy on real property acquisition practicesIn force
In order to encourage and expedite the acquisition of real property by agreements with owners, to avoid litigation and relieve congestion in the courts, to assure consistent treatment for owners in the many Federal programs, and to promote public confidence in Federal land acquisition practices, heads of Federal agencies shall, to the greatest extent practicable, be guided by the following policies: The head of a Federal agency shall make every reasonable effort to acquire expeditiously real property by negotiation. Real property shall be appraised before the initiation of negotiations, and the owner or his designated representative shall be given an opportunity to accompany the appraiser during his inspection of the property, except that the head of the lead agency may prescribe a procedure to waive the appraisal in cases involving the acquisition by sale or donation of property with a low fair market value. Before the initiation of negotiations for real property, the head of the Federal agency concerned shall establish an amount which he believes to be just compensation therefor and shall make a prompt offer to acquire the property for the full amount so established.
Official text (excerpt) · last checked 2026-07-28 · Read the full text in our law library · Verify at uscode.house.gov
§ 4655Requirements for uniform land acquisition policies; payments of expenses incidental to transfer of real property to State; payment of litigation expenses in certain casesIn force
Notwithstanding any other law, the head of a Federal agency shall not approve any program or project or any grant to, or contract or agreement with, an acquiring agency under which Federal financial assistance will be available to pay all or part of the cost of any program or project which will result in the acquisition of real property on and after January 2, 1971, unless he receives satisfactory assurances from such acquiring agency that— in acquiring real property it will be guided, to the greatest extent practicable under State law, by the land acquisition policies in section 4651 of this title and the provisions of section 4652 of this title, and property owners will be paid or reimbursed for necessary expenses as specified in sections 4653 and 4654 of this title. For purposes of this section, the term “acquiring agency” means— a State agency (as defined in section 4601(3) of this title) which has the authority to acquire property by eminent domain under State law, and a State agency or person which does not have such authority, to the extent provided by the head of the lead agency by regulation.
Official text (excerpt) · last checked 2026-07-28 · Read the full text in our law library · Verify at uscode.house.gov
Code of Federal Regulations Title 49
§ 24.102Basic acquisition policies.In force
(a) Expeditious acquisition. The agency shall make every reasonable effort to acquire the real property expeditiously by negotiation. (b) Notice to owner. As soon as feasible, the agency shall notify the owner in writing of the agency's interest in acquiring the real property and the basic protections provided to the owner by law and this part. (See §§ 24.203 and 24.5(d) and appendix A to this part, section 24.102(b).) (c) Appraisal, waiver thereof, and invitation to owner. (1) Before the initiation of negotiations, the real property to be acquired shall be appraised, except as provided in paragraph (c)(2) of this section, and the owner, or the owner's designated representative, shall be given an opportunity to accompany the appraiser during the appraiser's inspection of the property.
Official text (excerpt) · last checked 2026-07-28 · Read the full text in our law library · Verify at ecfr.gov
Search our full record of US law — 2.1 million sections, every state + federal →
Sources and References
- U.S. Const. amend. V, Takings Clause(www.law.cornell.edu)
- Kelo v. City of New London, 545 U.S. 469 (2005)(tile.loc.gov).gov
- Cedar Point Nursery v. Hassid, 594 U.S. 139 (2021)(www.law.cornell.edu)
- Berman v. Parker, 348 U.S. 26 (1954)(tile.loc.gov).gov
- Hawaii Housing Authority v. Midkiff, 467 U.S. 229 (1984)(tile.loc.gov).gov
- Executive Order 13406, Protecting the Property Rights of the American People (2006)(www.federalregister.gov).gov
- 40 U.S.C. 3113, Acquiring land by condemnation(www.law.cornell.edu)
- 40 U.S.C. 3114, Declaration of taking(www.law.cornell.edu)
- Fed. R. Civ. P. 71.1, Condemning real or personal property(www.law.cornell.edu)
- 28 U.S.C. 1491, Tucker Act(www.law.cornell.edu)
- Knick v. Township of Scott, 588 U.S. 180 (2019)(www.law.cornell.edu)
- Devillier v. Texas, No. 22-913 (2024)(www.supremecourt.gov).gov
- 15 U.S.C. 717f(h), Natural Gas Act right of eminent domain(www.law.cornell.edu)
- PennEast Pipeline Co. v. New Jersey, 594 U.S. 482 (2021)(www.law.cornell.edu)
- Hoffmann v. WBI Energy Transmission, No. 25-159, question presented(www.supremecourt.gov).gov
- Tyler v. Hennepin County, 598 U.S. 631 (2023)(www.law.cornell.edu)
- Pung v. Isabella County, No. 25-95 (June 23, 2026), slip opinion(www.supremecourt.gov).gov
- Sheetz v. County of El Dorado, 601 U.S. 267 (2024)(www.law.cornell.edu)
- 42 U.S.C. 4655, Requirements for uniform land acquisition policies(www.law.cornell.edu)
- 42 U.S.C. 4630, Requirements for relocation payments and assistance of federally assisted programs(www.law.cornell.edu)
- 42 U.S.C. 4651, Uniform policy on real property acquisition practices(www.law.cornell.edu)
- 49 C.F.R. 24.102, Basic acquisition policies(www.ecfr.gov).gov
- 49 C.F.R. 24.203, Relocation notices(www.ecfr.gov).gov
- Uniform Relocation Assistance final rule, 89 Fed. Reg. 36908 (May 3, 2024)(www.federalregister.gov).gov
- 49 C.F.R. 24.401, Replacement housing payment for 90-day homeowner-occupants(www.ecfr.gov).gov
- 42 U.S.C. 4623, Replacement housing for homeowner(www.law.cornell.edu)
- 49 C.F.R. 24.402, Replacement housing payment for 90-day occupants(www.ecfr.gov).gov
- 42 U.S.C. 4624, Replacement housing for tenants and certain others(www.law.cornell.edu)
- 49 C.F.R. 24.304, Reestablishment expenses(www.ecfr.gov).gov
- 49 C.F.R. 24.305, Fixed payment for moving expenses(www.ecfr.gov).gov
- 49 C.F.R. 24.301, Payment for actual reasonable moving and related expenses(www.ecfr.gov).gov
- 49 C.F.R. 24.502, Replacement housing payment for 90-day mobile homeowners(www.ecfr.gov).gov
- 49 C.F.R. 24.11, Adjustments of payment limits(www.ecfr.gov).gov