German Constitutional Court Upholds Cable Contract Termination Right

Independently fact-checkedBy Recording Law Editorial Team12 min read

Independently fact-checked against primary sources (last audited November 22, 2026). · 5 primary sources cited on this page. How we verify our legal content

German Constitutional Court Upholds Cable Contract Termination Right

Updates

Independently fact-checked against the cited primary sources

Sources and References

  1. Bundesverfassungsgericht (First Senate), Urteil of 16 November 2026, 1 BvR 1803/22, 1 BvR 2058/22, 1 BvR 2234/22, ECLI:DE:BVerfG:2026:rs20261116.1bvr180322, Rn. 1 to 125. Cited for the operative part rejecting the complaints, the four headnotes, the verbatim text of Section 230(5) TKG and Section 2 BetrKV (Rn. 6 to 7), the inadmissibility holding on the BetrKV challenge (Rn. 39 to 41), the Art. 14(1), Art. 12(1) and Art. 2(1) GG analysis, and the findings at Rn. 67, 69, 73, 84, 86 to 89, 97, 106, 115, 117 and 118.(bundesverfassungsgericht.de).gov
  2. Bundesverfassungsgericht, Pressemitteilung Nr. 73/2026 of 16 November 2026, 'Erfolglose Verfassungsbeschwerden gegen Sonderkuendigungsrecht von Bezugsvertraegen fuer Telekommunikationsdienstleistungen'. Cited for the Court's own summary of the case and for the figure of over 12 million affected German tenancies.(bundesverfassungsgericht.de).gov
  3. Bundesverfassungsgericht, Press Release No. 73/2026 of 16 November 2026 (official English version), 'Constitutional complaints challenging the right to terminate subscription contracts for telecommunication services unsuccessful'. Cited for the Court's official English rendering of the headnotes and of the over 12 million rental agreements figure.(bundesverfassungsgericht.de).gov
  4. Bundesverfassungsgericht (Third Chamber of the First Senate), Beschluss of 11 December 2023, 1 BvR 1803/22, ECLI:DE:BVerfG:2023:rk20231211.1bvr180322, Rn. 1 to 12. Cited for the earlier refusal of interim relief in the same proceedings, operative part 'Der Antrag auf Erlass einer einstweiligen Anordnung wird abgelehnt', and for the finding that the complaint was neither obviously inadmissible nor obviously unfounded.(www.bundesverfassungsgericht.de).gov
  5. Regulation (EU) 2024/1309 of the European Parliament and of the Council of 29 April 2024 on measures to reduce the cost of deploying gigabit electronic communications networks, amending Regulation (EU) 2015/2120 and repealing Directive 2014/61/EU, Article 11 'Access to in-building physical infrastructure'. Cited for the EU access rule the judgment names at Rn. 89 as one of the two unresolved ordinary-law routes for in-building equipment.(eur-lex.europa.eu).gov
Share: